Manchester Metropolitan University – Demolition of Alsager Campus

The Demolition of Accommodation Blocks at the Alsager Campus

Connell Brothers were appointed as demolition contractors for the demolition of accommodation blocks at the Alsager Campus in Crewe on behalf of Manchester Metropolitan University.

Alsager Campus
The Alsager Campus is located at Crewe and the demolition works comprised the removal of a number of three storey brick student accommodation blocks to the northern boundary of the campus. Once again the asbestos was removed by our in-house asbestos specialists prior to demolition works being carried out.

Demolition was undertaken by the use of traditional demolition excavators equipped with specialist demolition attachments and the materials were segregated to enable them to be re-used wherever possible. The foundations were also removed and the suitable demolition materials were crushed on site to be incorporated in the development works.

CLIENT: Manchester Metropolitan University
QUANTITY SURVEYOR: Turner Townsend
CDM CO-ORDINATOR: Keelagher Okey Klein Associates Ltd