PROJECT:
DEMOLITION OF BLOCK A
DEMOLITION OF BLOCK A – The works comprised the total demolition and site clearance of A Block, Leeds Metropolitan University.
The demolition was conducted employing specialist high reach demolition mechanical excavators equipped with suitable attachments which carry out the demolition, working in a piecemeal controlled fashion. B’ Block which was to be retained and protected.
The elevation affected by the party wall was carefully demolished using hand separation demolition techniques. This element of the works was conducted in line with restrictive boundaries demolition as detailed in GS 29 Parts 1, 3 and 4. Suitable waterproofing will be on Block B following the completion of the separation works.
The main office building was demolished by the use of a ground-based high reach demolition excavator utilising specialised demolition attachments, i.e. pulverisers, concrete cracker etc. The works were completed on time to the full satisfaction of the client. Mr Paul Reily the Project Manager for the University praised Connell Brothers approach to the works as a whole:-
“They were professional on all levels, and were aware of the sensitivity of a difficult project, being located adjacent to other ‘live’ buildings.
I would recommend Connell Bros Ltd to undertake demolition works and feel they excel in this field particularly when faced with many project constraints”.
Key Facts
The works were completed on time to the full satisfaction of the client. Mr Paul Reily the Project Manager for the University praised Connell Brothers approach to the works as a whole.