Case Study Example – Maths Tower

In 2005, CBL demolished the landmark 21 storey Maths Tower in Manchester city centre, the largest tower demolition that has taken place in the city. The tower was located within the confines of the live University of Manchester Campus, which is recognised as the largest campus in Europe. Coupled with this was the fact that the building fronted onto one of the busiest roads in the city centre.

Due to the highly sensitive location of the project, stringent measures had to be implemented to control noise, dust and vibration. The tower was surrounded by occupied lecture theatres, libraries and auditoriums thus it is imperative that the work is carried out causing the minimum of fuss and disturbance to those studying inside as well as the general public and traffic on Oxford Road.

Careful planning and Liaison are also playing a crucial role in the smooth running of the contract. Working closely with the University, City Council, and Greater Manchester Passenger Transport Executive is essential. Regular safety and progress meetings were held with numerous departments within the University to alleviate any concerns that they may have as the works proceed.